CSR&RECOGNITIONS
Waste Incineration

Waste Incineration

Established in 2013, Waste Incineration Division has 5 municipal waste incineration plants. It takes control in investment, construction, and operation all these projects. The total capacity is 5,000 tons/day and the designed total waste disposal capacity is 1.825 million tons. The total service population is about 5.6 million. The project includes Pucheng Waste Incineration Thermal Power Generation (The first 1000-ton capacity waste incineration power project in China), Wenling Waste Incineration Power Generation, Dazhou Waste Incineration Power Generation, Wulian Waste Incineration Power Generation, and Shandong Shenxian Circular Economy industrial park incineration power generation.

The Waste Incineration Division has always been adhering to the concept of “Ecological Priority, Mutual Benefit and Win-Win”, and has always been committed to achieving the goal of harmonious coexistence between man and the environment. The Waste Incineration Division implements strict and rigorous management of its waste-to-energy projects. Pucheng Waste Incineration Project and Wenling Project have successively been designated as Level AA and Level A domestic waste incineration plants by the Ministry of Housing and Urban-Rural Development. The completion of projects such as Shanghai Yuqiao, Wenling in Zhejiang, and Dazhou in Sichuan significantly increased the treatment level of domestic waste in a harmless, reduced, and resource-based way and brought good social and environmental benefits.